JAS.
Civil engineer · Dublin, Ireland

Jafar Ali Shaik

Hold Accelerate to drive through my portfolio. Brake to read, then get out and visit the shops.

0KM/HN
End of the road · Contact

Let's build something.

Emailjafarali9k@gmail.com
Phone+353 89 466 3188
LinkedInjafarali9k
Open the full site file ↓

Site file · Core civil engineering

What I do on site

Each skill comes from work I've done on site or documented in my final-year project.

Setting out & levelling

Auto level surveys, carrying levels from benchmarks, and checking excavation depths and road levels.

Used on ELSR and CC roads

Earthworks & compaction

Excavation, compaction in layers, and moisture and density checks before foundations.

Used on ELSR foundation

Reinforcement inspection

Checking raft, column, ring beam and brace steel against drawings, and verifying bar bending schedules, spacing and cover before concreting.

Circular raft · Fe 550D steel

Formwork, PCC & concreting

PCC beds, formwork and staging checks, pours, compaction and curing for elevated RCC structures.

22 m staging · M30 concrete

Concrete & materials testing

Slump cone, cube compressive strength, core cutting and sieve analysis, with results recorded for QA/QC.

Site and lab testing

Reading structural drawings

Foundation plans, column layouts, brace-level plans and ring beam sections, compared against what's built on site.

IFC and working drawings

Water-retaining structures

Limit state design to IS 3370 (2009): hoop tension in circular tank walls, crack width limited to 0.2 mm, and water-tightness testing.

Final-year design study

Rigid pavements (CC roads)

Subgrade preparation, levels, expansion joints and concrete quality control on cement concrete roads.

APTIDCO housing colony roads

Quantities & BOQ

Quantity take-offs from drawings, Bills of Quantities, measurement sheets, variation tracking and billing support.

GSR Construction · fit-out

Site safety & coordination

Daily coordination with supervisors, labour teams and subcontractors. Safe manual handling trained to Irish and EU standards.

Manual Handling · valid to 2029
Site file · Software

Digital toolkit

AutoCAD2D

Drafting & drawings

Plans, sections and details for design and site use.

Autodesk Certified Professional exam prep · Coursera · Sep 2023
RevitBIM

Building information modelling

3D architectural models, views and sheets.

Autodesk Certified Professional exam prep · Coursera · Mar 2023
ETABSFEA

Structural analysis

Modelling and design of a multi-storey building.

"Design of building using ETABS" internship · SkillDzire · Apr 2024
STAAD.Pro

Structural analysis

Frame analysis fundamentals.

Working knowledge
P6Primavera

Planning & scheduling

Programmes, progress tracking and cost-linked schedules.

Primavera P6 & QS Estimation · Udemy
ExcelMS

Quantities & cost control

Take-off sheets, BOQs, measurement and billing trackers.

Getting Started with Microsoft Excel · Coursera · Nov 2023
Site file · IT, cloud & AI

Beyond the site

Training in the cloud, CRM and AI tools that construction companies increasingly use for project data and reporting.

SalesforceCRM

Salesforce Administrator

Org setup, Sales and Service Cloud, Flow automation, data security, and reports and dashboards.

8-week virtual internship · SmartInternz with AICTE · Apr–May 2023
AWSAI-ML

AI & machine learning

A 10-week internship in machine learning fundamentals on AWS Academy.

AI-ML Virtual Internship · AWS Academy, EduSkills & APSCHE · Sep–Nov 2022
GCPCloud

Google Cloud

Digital transformation, modernising infrastructure and applications, and scaling with cloud operations.

4 courses · Google Cloud via Coursera · Aug–Sep 2022
AIStrategy

AI For Everyone

What AI can and can't do, and how to plan AI projects inside an organisation.

DeepLearning.AI via Coursera · Apr 2021
OfficeMS

Reports & presentations

Word, PowerPoint and Excel for project reports, MBA consultancy work and presentations.

Used across B.Tech and MBA projects
DataAnalysis

Research & analysis

Survey design and data analysis for MBA dissertation research.

MBA, Dublin Business School · 2026
Site file · Featured project

Elevated Level Storage Reservoir & CC Roads

ELSR staging columns and bracing under construction
KBC Infrastructure · Vengalayapalem, Guntur · 2024

Water tower for an APTIDCO government housing community

I worked on site as an intern engineer from foundation to staging. The work became my B.Tech final-year project, which I co-authored with four classmates under Mrs K. Sai Ramya.

Capacity
600 KL
Staging height
22 m
Roof level
29 m
Foundation
Circular raft
Steel
Fe 550D
Design code
IS 3370

Levels & excavation

Ran auto level checks from the benchmark to control excavation depth, then checked compaction before the PCC bed.

Raft & staging steel

Checked circular raft, column, ring beam and brace reinforcement against the drawings and BBS before each pour.

Quality control

Took part in slump tests on site and in compressive strength, core and sieve tests in the lab. Also took levels on the colony's CC roads.

Site file · Experience

Where I've worked

  1. 2024May 2024 – Jan 2025

    Graduate Quantity Surveyor / Site Coordinator

    GSR Construction and Interior Studio · Hyderabad, India
    • Produced quantity take-offs and BOQs from construction drawings for residential and fit-out projects.
    • Coordinated site engineers, subcontractors, design and procurement so deliveries matched the installation sequence.
    • Tracked variations and kept measurement sheets, redlines and project records ready for handover.
    • Supported cost estimates, client billing and budget monitoring in Excel and Primavera P6.
  2. 2024Jan 2024 – Apr 2024

    Intern Site Engineer

    KBC Infrastructure · APTIDCO ELSR & CC roads, Guntur
    • Checked reinforcement and formwork against structural drawings before concreting.
    • Verified bar bending schedules and spacing, raising drawing-to-site discrepancies early.
    • Took levels with an auto level for excavation and road works.
    • Recorded measurements and as-built information for billing and progress tracking.
  3. 2024Apr 2024

    Structural Design Intern

    SkillDzire · Design of building using ETABS
Site file · Education

Learning

2025 – 2026 · DUBLIN

MBA, Project Management

Dublin Business School · Second Class Honours, Grade 1 (2:1) · 62.11%

2020 – 2024 · INDIA

B.Tech, Civil Engineering

Vasireddy Venkatadri Institute of Technology (JNTU Kakinada) · GPA 8.52

MBA dissertation

The Impact of EU Funding on Infrastructure Project Delivery in Ireland

An empirical study with Irish project stakeholders.

  • How does EU funding change the cost, timeline and quality of Irish infrastructure projects?
  • What challenges and benefits do stakeholders face when managing EU-funded projects?

Also: a Glanbia plc strategy report (PESTEL, Five Forces, VRIO, SWOT/TOWS) and a strategic marketing analysis of Spotify in Ireland.

Site file · Certificates

Credentials

  • Manual Handling TrainingIRISH MANUAL HANDLING · 2026–29
  • Design of Building using ETABSSKILLDZIRE · 2024
  • AutoCAD for Design & DraftingAUTODESK / COURSERA · 2023
  • Revit for Architectural DesignAUTODESK / COURSERA · 2023
  • Getting Started with Microsoft ExcelCOURSERA · 2023
  • Primavera P6 & QS EstimationUDEMY
  • Salesforce Administrator Virtual InternshipSMARTINTERNZ · 2023
  • AI-ML Virtual InternshipAWS ACADEMY · 2022
  • Google Cloud (4 courses)COURSERA · 2022
  • AI For EveryoneDEEPLEARNING.AI · 2021